Yardage Calculator
Estimate your concrete order
Add every slab, footing, wall, or column in your pour. We total the yards, apply your waste allowance, and estimate the number of trucks. Verify with dispatch before ordering.
Pour items
Add as many shapes as your project has.
20' × 12' × 4"
2.96 yd³
10% is a common allowance for spillage, uneven subgrade, and over-excavation.
Total Estimate
3.26yd³
≈ 88.0 ft³ · 1 item · includes 10% waste
Trucks (~10 yd³)
1
Items in pour
1
Breakdown
- Slab #12.96 yd³